
A Design and Build project for the MoD incorporating 6 blocks (240-bed) of Junior Ranks Single Living Accommodation at Brize Norton. INTEC's role was:
o To appoint a full design team including architects, structural and service engineers; o To manage the design process and make sure coordinated design information was available for construction in a timely manner; o To facilitate regular Value Engineering sessions of Carillion, to look at cost saving and introduce buildability savings; o To be the "one stop shop" for coordinated detailed design including Structural, M&E and storm & foul drainage.
|