
This 100 sq m extension was fitted out with no loss of trading, which included not only new floor, wall and ceiling finishes, but also new air conditioning, lighting and shop fittings and all this in just five days within an almost unbelievably tight budget!
INTEC's insistence on producing a tight scope of work, having considered all practical alternatives and in using the right contractor for this small, yet critical project, not only gave the shop floor back for use ahead of time, but optimised the project for maximum value and customer's satisfaction. |